Project Overview
General
Electric
Pittsfield, MA
Project
Objectives
 |
Prepare former industrial
facility power plant for complete demolition |
 |
Remove
all asbestos-containing materials impacted by demolition |
PROJECT FEATURES
 |
Abatement/dismantling of 20' x
20' x 80' boiler, including top and breeching |
 |
Abatement/dismantling
of four 20' x 20' x 60' boilers, including top and breeching |
 |
Removal
of 20,000 linear feet of asbestos pipe insulation |
 |
Boiler,
engine, and compressor rooms; electrical building; offices; tunnels,
vaults and tanks |
PROFESSIONAL
SERVICES
 |
Pre-demolition asbestos
inspection |
 |
Identify,
quantify, design, and manage removal of asbestos-containing materials |
 |
Identify
lead-based paint to be impacted and review appropriate work practices |
 |
Preparation
of contract documents, including plans, specifications, and cost estimate |
 |
Environmental
monitoring and testing |
PROJECT SIZE
 |
$1.5 million of asbestos
abatement |
PROJECT DURATION
 |
18 months of work completed
over a four year period. |
(Click to have receive a no obligation proposal on this
type of work)

|
For More Information Contact:
Eco-Genesis Environmental Consultants
180-1 Elm Street, Suite #201, Pittsfield, MA 01201
Tel: (413) 445-7756
FAX: (413) 499-7438
Internet: info@Ecogenesis.com
|